MP-070054, N01-54/55 UPlatNS St.Gallen West - St.Gallen East (part signaling): TP405, delivery and installation of new alternating text displays (WTA) including renovation and installation in existing housings
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
TP405 Delivery and installation of 6 new alternating text displays (WTA) including renovation and installation in existing housings in the project MP-070054 UPlatNS SWO, signaling “SIG-SWO”. Replacement will take place in 6 stages (only one WTA signal/housing will be renovated at a time). TP405 includes: Dismantling consists. WTA in night work and transport complete WTA housing to the UN-TP405. Dismantling and disposal of old WTA installations that are no longer needed (WTA display module, control computer, HVAC control, ventilation, heating, lighting and temperature sensors, etc.). Renovation of the existing 6 WTA housing including installation of new WTA display module including ventilation and heating, roof access, roof heating, gutter and drain/downpipe with heating, including control for auxiliary operations, roof and roof drain heating with separate control unit via temperature and humidity sensors. Installation of WTA signal at night on existing framework (same location as dismantling). WTA with apparatus cabinet including electromechanical. Expansion and assembly in the factory for WTA control computer, operating unit with monitor/mouse/keyboard input switch for normal and emergency network (incl. overvoltage protection and EMC filter), etc. WTA-SR (IPC) fully installed in WTA equipment cabinet including complete necessary infrastructure (comm. to system control, traffic information system AS-VIS, LED controller, etc.), WTA-SR in the function as local and emergency control with all defined images from AS-VIS. LS-WTA (PLC) for monitoring and reporting the auxiliary operations (energy, ventilation, heating, exposure and temperature sensors, etc.) completely including communication components (switch) for internal communication between WTA-SR and the display controllers. All services for the TP405 (work according to process planning) are part of the order. Summary (not exhaustive, see also specification): RPH, techn. Processing/engineering entire system, execution documents, construction drawings (adapt/add to existing housing), DP lists,