Purchase of pre-insulated steel pipes and accessories Dn 600 ÷ 800 mm Default lot
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Purchase of pre-insulated steel pipes and accessories Dn 600 ÷ 800 mm Default lot
(the nature and quantity of the works, products or services or a mention of the needs and requirements) Estimates of the minimum and maximum quantities that could be requested during the entire framework agreement and the largest subsequent contract can be found specified in Annex 2 List of minimum / maximum quantities Framework Agreement/Subsequent Contract related to the Specifications. The subsequent contracts related to the framework agreement will be signed every six months and/or according to the needs of the Contracting Authority. The duration of subsequent contracts will be a maximum of 6 months.
Related Procurement Opportunities
Similar tenders in Construction materials, Industry, Oil and Gas Product and Equipment