McAlpine Lock and Dam Control Tower HVAC Replacement
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Award Notice McAlpine Lock and Dam Control Tower HVAC Replacement
PROJECT TITLE: MCALPINE LOCK AND DAM CONTROL TOWER HVAC REPLACEMENT
PROJECT LOCATION: MCALPINE LOCKS AND DAM, 805 NORTH 27TH STREET, LOUISVILLE, KY 40212
THE SCOPE OF WORK INCLUDES THE REMOVAL OF THE EXISTING 3-TON RESIDENTIAL CENTRAL HEAT PUMP SYSTEM, REPLACING IT WITH A NEW 3-TON SYSTEM, REPLACE THE EXISTING THERMOSTAT WITH A NEW PROGRAMMABLE THERMOSTAT, INSTALL NEW THERMOSTAT CONTROL WIRING FROM THE AIR HANDLER/FURNACE TO THE THERMOSTAT LOCATION. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE CODES, STANDARDS, AND MANUFACTURER’S RECOMMENDATIONS. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR, EQUIPMENT, MATERIALS, AND TOOLS TO COMPLETE THE WORK. PRICES SHOULD INCLUDE MOBILIZATION & DE-MOBILIZATION, FUEL, LABOR, MATERIAL AND EQUIPMENT.
THIS PROCUREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 238220, SIZE STANDARD $19,000,000.00.
IN LIEU OF BOTH PERFORMANCE AND PAYMENT BONDS, PER RFO 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (2000) AND RFO 28.102-1(B), ONLY A PAYMENT BOND OR IRREVOCABLE LETTER OF CREDIT IS REQUIRED.
Related Procurement Opportunities
Similar tenders in Construction materials, Engineering, Machinery and Equipments(M&E)