Get Free Access
TZ Ref No.: TZ-1005564
Contract Award Awarded Contract 🌍 International (ICB) Poland Railways Construction materials Infrastructure and construction

Design and execution of works entitled: Section C - construction works on railway line No. 201, section Gdańsk Osowa - Gdynia Główna as part of the project Works on the Kościerzyna - Gdynia section Design and execution of works entitled: Section...

Doc ref no. 00608368-2026
Sector Railways, Construction materials, Infrastructure and construction
Contract Date 04 Sep 2026
Contract Value Undisclosed
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Contract Description

Design and execution of works entitled: Section C - construction works on railway line No. 201, section Gdańsk Osowa - Gdynia Główna as part of the project Works on the Kościerzyna - Gdynia section Design and execution of works entitled: Section C - construction works on railway line No. 201, section Gdańsk Osowa - Gdynia Główna as part of the project Works on the Kościerzyna - Gdynia section
The subject of the Order is the execution of the following elements: design and execution of works entitled: Section C - construction works on railway line No. 201, section Gdańsk Osowa - Gdynia Główna as part of the project Works on the Kościerzyna - Gdynia section Implementation of the task entitled Section C - construction works on railway line No. 201, section Gdańsk Osowa - Gdynia Główna as part of the project Works on the Kościerzyna - Gdynia section, will be carried out in the Optimize and build system and for task A (design and build railway control and telecommunications industries); Design and build for tasks B and C; The entire subject of the Order includes the execution of works for the double-track railway line No. 201 on the section from km 191+731 (191+629 planned) to km 205+200 and the double-track railway line No. 202 on the section from km 16+900 to km 21+500, which includes the reconstruction of railway lines no. 201 with the construction of the third track (railway line No. 794) and No. 202 for the track industry (including subgrade and subgrade reinforcement), road, railway traffic control, traction, power, telecommunications, engineering, cubature, platform, sanitary, environmental protection, tree felling, demolition of cubature structures, non-traction lines, hydrology, phasing, traffic organization, etc. Order consists of the following scopes constituting the basic scope of the order and includes the preparation of: 1) design documentation necessary for the proper performance of all construction works and obtaining all required opinions, arrangements, approvals, conditions, decisions and permits necessary for the implementation of the subject of the order, as well as updates of the opinions, arrangements, approvals, conditions, decisions and permits already obtained for the investment in question, making arrangements by the Contractor with SKM Trójmiasto to the extent possible to implement the investment; 2) all construction works in accordance with the scope of the order on the basis of the design documentation developed by the Contractor and approved by the Ordering Party, referred to in the above-mentioned. point 1, and all preparatory works necessary to perform the scope of the Agreement and perform all activities required by law; 3) carrying out a conformity assessment of each structural subsystem covered by the scope of the contract at each stage (design, construction and final tests of the subsystem). In addition, the Ordering Party also provided for optional orders: 1) Option right 1: Updating the ETCS system level L2; 2) Option right 2: Passenger stop with the working name Gdynia Źródło Marii - implemented in the design and build formula based on the concept of the Gdynia Wielki Kack station provided by the Ordering Party; 3) Right to option 3: Passenger stop with the working name of Gdynia Mały Kack - implemented in the design and build formula on the basis of the DZ provided by the Ordering Party (in place of the field reserve); 4) Law of Option 4: Option on interface. The order covers the design and implementation of track (including track subgrade and subgrade reinforcements), road, railway traffic control, engineering, traction, power, telecommunications, cubature, platform, sanitary, environmental protection, tree felling, demolition of cubature structures, non-traction lines, hydrological, phasing and traffic organization in the Infrastructure, Control and Energy subsystems.

Days to Deadline
46 days
Closing: 03 Dec 2026, 00:00

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 00608368-2026
Notice Type Contract Award
Contract CPV 29813000, 14100000, 45000000
Contract Project Location Poland
Contract Value Undisclosed
Contract Date 04 Sep 2026
Contract Deadline 03 Dec 2026

Buyer Contact Information

Contact Details Locked

Nodal officer email, telephone, and website coordinates are unlocked upon free sign up.

Unlock Contact Details (Free) →