Forchbahn, Cluster 27, overhead line work
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Cluster 27 includes the Scheuren train station (SCRN), the section between Egg train station (EGG) and the Langwies stop (LIES) and the Langwies stop (LIES) for the overhead line area. At Scheuren train station (SCRN), the crossing area will be expanded from 180 m to approx. 530 m. The overhead line will be completely replaced in the area. Due to road/rail clearance gauge violations as well as the planned renewals and to ensure the performance of the network in the section from Egg station (EGG) to Langwies stop (LIES) (km 10,980 to km 11,535), the superstructure and substructure of the roadway, including route drainage, will be renewed over a length of approx. 550 m. In the project area, all supporting structures of the contact line will be replaced. The chainwork, the reinforcement cable and the return cable are retained.