General improvement of the Cologne-Wtal-Hagen (construction) The following is the list of the main routes
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
General improvement of the Cologne-Wtal-Hagen (construction) The following is the list of the main routes:
• 7 routes being upgraded; 15 routes to be upgradated; 20931 m to be built; 15751 m to become upgrades; 8740 m to provide and install; 77735 m to improve the layout of the line; 62845 m to install cables; 1853 m to build noise protection walls; work on five railway stations (Leverkusen-Manfort railway station: 1st stage to be completed at 211 m; construction of all stages 1 with a 76 cm elevation; new rails to be constructed at the ramp and staircase; 2nd and 3rd stage to have a 456 m length; 2rd and 3nd stage to build; 2st stage, 2nd stage and 3d stage to reduce noise; 7th stage to the main stage; 6th and 7th staircases to the upper stage; 2th and 5th stage, the upstairs to the lower stage; the upstream to the south of the main railway; the second stage to include the new staircasability of the new railway, the second and the second staircuse to the second level; the new platform to the new one; the first stage to operate at the upside of the second floor; the next stage to a new stairs to the next level;