Get Free Access
TZ Ref No.: TZ-1072179
Contract Award Awarded Contract National (NCB) United States Construction materials Fire Safety and Security Defence

Accelerated Design-Build to Budget Construct Barracks, Multi-Use Training Facility, Galley & Firehouse at USCG TRACEN Cape May, Cape May, NJ

Doc ref no. 70Z04723DPCNI0006
Sector Construction materials, Fire Safety and Security, Defence
Contract Date 19 Sep 2026
Contract Value $ 400.0M
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Contract Description

Award Notice Accelerated Design-Build to Budget Construct Barracks, Multi-Use Training Facility, Galley & Firehouse at USCG TRACEN Cape May, Cape May, NJ
The project will be to Design/Build new facilities at TRACEN Cape May, NJ. The scope of work includes but is not limited to construction of barracks buildings to accommodate an annual capacity of 5,600 recruits. It is a critical and non-negotiable requirement that the annual operational capacity of TRACEN Cape May be maintained without interruption for the entire duration of the construction project. Therefore, all construction efforts must be planned and executed in a manner that ensures no reduction in the annual number of recruits processed. The continuity of operations is a paramount objective of this project.
While the RFP drawings indicate the construction of four barracks buildings, the Designer of Record is granted the flexibility to modify this number. The ultimate number of buildings is secondary to achieving the essential operational throughput. This approach allows for potential design optimizations and innovative solutions, provided the core mission-critical requirement of recruit accommodation capacity is fully satisfied.
The scope of work includes but is not limited to; demolition and disposal of abandoned steam trenches, buildings and building old foundations, relocation of electrical duct banks and salvaging of transformers, temporary office trailer setup, construction of new VIP review stand, grandstands with cantilevered shading and new parade path. During construction of the new barracks a minimum of 3 barracks buildings must remain operational at all times. This project can be delivered in phases. However, the construction phases outlined here will occur only after the Base Item 0001 process is awarded and finalized. Proposed phasing is as follows: During phase 1, the existing MCPOCG (Bldg. 911) can be demolished and two temporary office trailers will be provided complete with water, sewer, electrical and C5IT connections. Two new barracks buildings can be constructed. Then James and Healy Halls can be demolished. Phase 2 will require construction of all remaining barracks facilities. In addition to the remaining barracks facilities, construction of several facilities is required in order of precedence:
1.Multi-purpose training facility (~80,000GSF)
2.Galley or expansion of existing galley to meet future throughput requirements. (~35,000GSF)
3.Fire station (~20,000GSF)
The firehouse must have a natural gas generator and automatic transfer switch meeting the requirements of NFPA 70, Article 701, Legally Required Standby Systems. The generator shall be sized to power all the loads within the entire building.
The UPS shall power all loads associated with emergency services. Emergency services loads include, but are not limited to: radio communication system, emergency response system, fire alarm front end, burglar alarm front end, all communication equipment, etc.
Note: See Attachment H
Prior to demolition of existing galley and fire station, the new facilities will need to be constructed. All facilities are required to be sustainable in accordance with the Council on Environmental Quality (CEQ) Guiding Principles for Federal Buildings, Dec 2020. All facilities shall strive to incorporate the best in energy efficiency, environmental performance, and advanced controls using a “whole building” integrated design approach, as well as comply with ENERGY STAR standards. The final phasing of these additional facilities will have to be determined by the Designer of Record (DOR) in coordination with the TRACEN Cape May Facility Engineering office. See site civil drawings.

Days to Deadline
61 days
Closing: 17 Dec 2026, 00:00

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 70Z04723DPCNI0006
Notice Type Contract Award
Contract CPV 14100000, 17225300, 18111420
Contract Project Location United States
Contract Value $ 400.0M
Contract Date 19 Sep 2026
Contract Deadline 17 Dec 2026

Buyer Contact Information

Contact Details Locked

Nodal officer email, telephone, and website coordinates are unlocked upon free sign up.

Unlock Contact Details (Free) →