Construction of Zaghloul El Bahary Wastewater Treatment Plant (WWTP), Design – Build, Defect Liability Year, and Optional One (1) Year of Operation and Maintenance Construction of Zaghloul El Bahary Wastewater Treatment Plant (WWTP), Design –...
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Construction of Zaghloul El Bahary Wastewater Treatment Plant (WWTP), Design – Build, Defect Liability Year, and Optional One (1) Year of Operation and Maintenance Construction of Zaghloul El Bahary Wastewater Treatment Plant (WWTP), Design – Build, Defect Liability Year, and Optional One (1) Year of Operation and Maintenance
The work to be carried out under this works contract comprises the permanent works (facilities and systems) related to the new Zaghoul El Bahary WWTP (15,000 m3/d, 2037 expanded to 25,000 m3/d, 2052) in Motobas District, Kafr El Sheikh Governorate, to be designed, constructed, and commissioned; the effective restoration of any defects during the 1-year Defects Liability Period; and the optional 1-year of normal operation and maintenance of the works for the WWTP. The contract comprises also the provision of training services to the Procuring Entity’s personnel duly completed within the Defects Liability Period or the Optional 1 year Operation and Maintenance Period as the case may be, and before the works hand-over. Some minor works of the Plant has been executed by another Contractor in a previous phase. Although not part of the Works, the Contractor shall be aware of its obligations toward these Existing Works as defined in the Contract Documents. Average design capacity is 15,000 m3/d (6,000 kg BOD5/d) design horizon 2037 (expanded to 25,000 m3/d, 2052). The Plant will receive influent wastewater from in-system pumping stations and treated effluent will be discharged to Zaghloul Main Drain. Process involves Extended Aeration Activated Sludge and shall target carbon, nitrogen and suspended solids removal and sludge stabilization.