Construction site clearance and development - Saxony-Anhalt barracks Weißenfels, GNUE new construction of maintenance hall HIL (SHB 696-24) Construction site clearance and development - Saxony-Anhalt barracks Weißenfels, GNUE new construction of...
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Construction site clearance and development - Saxony-Anhalt barracks Weißenfels, GNUE new construction of maintenance hall HIL (SHB 696-24) Construction site clearance and development - Saxony-Anhalt barracks Weißenfels, GNUE new construction of maintenance hall HIL (SHB 696-24)
Clearing of construction site and development: - Clearing around 30,000 m² of area of low vegetation - Removing and disposing of around 3,000 m³ of topsoil - Removing around 6,000 m³ of topsoil and transporting it to interim storage - Sieving around 5,000 m³ of topsoil in a mobile screening plant - Laying around 270 m of SW sewer DN 200 PP, including earthworks - Build approx. 6 new shafts, depth 2 to 2.5 m - approx. 13,500 m³ of excavated soil for rain retention basins with intermediate storage up to approx. 500 m - approx. 12,000 m³ of excavated soil to be installed as a raised area - approx. 2,100 m² of bentonite mats to seal the sludge trap - approx. 2,500 m² of large concrete paving stones in embankments as manual installation - approx. 2,700 m² of embankment areas secured with erosion protection mats - approx. 200 m² of trough gutter B = 3 m, laid from large-format concrete stone in sub-concrete. - floating diving wall made of PE-HD, including embankment end wall - 1 throttle structure with slide and drain throttle - approx. 360 m new construction of RW channel made of concrete DN 1200 to DN 800 - new construction of 7 RW shaft D = 1.5m, depth up to approx. 3 m - new construction of TW line DN 150, 1 hydrant, slide - approx. 500m Construction fence and construction fence gate - various cable trenches for MS, LV, lighting, heating cable, FM combined and individually, totaling approx. 1,500 m
Related Procurement Opportunities
Similar tenders in Construction materials, Infrastructure and construction, Industry