Drafting of the Project Morphological Recovery and Ecological Improvement of the Lucc Stream. Tm Santa Oliva and the Friday
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The object of the contract is the drafting of a construction project that must define the works corresponding to an action foreseen in the current hydrological planning. The action that is the subject of this report is included in the Program of measures of the Catalan river basin district management plan for the period 2022-2027, approved by Agreement GOV/108/2023, of May 16, with the code A2.067 "Environmental improvement actions of the Riera de la Bisbal basin". Given the poor state of the water at the mouth of the Bisbal stream, in Vendrell, and resulting from resolution 797/XII of the Parliament of Catalonia in 2021, the ACA planned a basin recovery measure in the Program of measures of the third cycle of hydrological planning (2022-2027). Therefore, this action aims at the morphological recovery and ecological improvement of the Torrent del Lluc in its section between Santa Oliva and Vendrell, in a length of approximately 4 km with the following coordinates: start (X: 3778231.3; Y: 4567869.7) and end (X: 377743.15, Y:4564696.91). Place of performance: Barcelona, Catalonia, Spain Contract type: Serveis Procedure: Obert simplificat Processing type: Ordinària Awarded contractor: SOCOTEC ENGINEERING SOLUTIONS SPAIN, S.L.U. Contractor Tax ID (NIF): B66113457 Awarded contract value: 74,623.31 EUR