Campus Kasteelstraat - floor renovation block C
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The assignment concerns the renovation of the floor structure of three classrooms and the associated circulation space/corridor in an existing school building. The total floor area to be treated is approximately 280 m². The reason for the works is the established subsidence of the existing floors. The foundations and the load-bearing structure of the building are structurally sound. The problem is located at the existing floor structure and the underlying heterogeneous addition, consisting of sand, black soil and stone rubble, among other things. The assignment mainly includes: • design and shielding of the site, with special attention to dust control and implementation in a school environment; • completely demolish and remove the existing floor structure; • excavating the existing subsoil to the required level for the new floor structure; • loading, removing and processing the excavated materials via a licensed processor; • installing, leveling and properly compacting a new stable substructure; • applying a PE foil/vapour barrier; • installing pressure-resistant floor insulation; • realization of a new reinforced concrete floor slab; • carrying out a new screed; • installing a new ceramic tile floor, including associated tile skirting boards; • injecting the walls of the classrooms against rising damp; • carrying out the necessary adjustments to the existing pipework; • carrying out the necessary electrical works and adjustments resulting from the demolition and reconstruction of the floors. The works must be carried out as one coordinated whole. When setting prices, the contractor must take into account all necessary labor hours, materials, tools, transport, removal and processing costs and all additional work that is necessary for a complete and ready-to-use implementation. For the detailed description, quantities and method of quotation, please refer to b