Modernization of the bridge ev. No. 212 5 – 1 Wetland
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The existing bridge on road III/2125 in the village of Mokřina, which carries traffic over the Lipoltovský potok, will be removed as part of the modernization and replaced by a new reinforced concrete half-frame bridge based on micropiles while maintaining a clearance of 7.9 m. The construction includes modifications to the connecting road, a new road, reinforced concrete ledges with railings, a drainage system and necessary modifications to the control walls along the stream. The area under the bridge will be restored to its original state. The construction will be carried out during the complete closure of the bridge, while pedestrian and bicycle traffic will be conducted on a temporary footbridge. Before the start of work, temporary traffic signs will be installed and all underground networks will be laid out. Place of performance: Sokolov Contract type: Stavební práce Procedure regime: VZ malého rozsahu Awarded to: Ing. Pavel Bartoň Awarded contract value: 8,464,059.00 CZK