Manufacture and installation of measurement and control equipment for water supply supply project in areas with weak water supply around 111-1 Jinmok-ri
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Official South Korea Government Procurement solicitation for Manufacture and installation of measurement and control equipment for water supply supply project in areas with weak water supply around 111-1 Jinmok-ri. Procuring Authority: 경기도 포천시 건설교통국. Procurement Method: 지명경쟁. Contract Type: 총액계약. Estimated Price: 42,409,091 KRW. Allocated Budget: 46,650,000 KRW. Submission Opens: 2026-11-05 01:00 UTC. Submission Deadline: 2026-11-12 01:00 UTC. Bid Opening: 2026-11-12 02:00 UTC. Contact Officer: 전소희. Telephone: 0315383404. Attached Documents: (긴급)입찰공고문(진목리 111_1번지 일원 급수취약지역 상수도 보급사업 계측제어설비 제작 및 설치).hwpx, (긴급)입찰공고문(진목리 111_1번지 일원 급수취약지역 상수도 보급사업 계측제어설비 제작 및 설치).pdf, 심사결과서(진목리 111_1번지 일원 급수취약지역 상수도 보급사업 계측제어설비 제작 및 설치).hwpx, 내역서(진목리 111_1번지 일원 급수취약지역 상수도 보급사업 계측제어설비 제작 및 설치).xlsx.