Germany – Construction work for railways and cable transport systems – ESTW 1271 - VP 02.10 Cable crossing and KTB for connection to GW Neuwiedenthal
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
For the traction current connection, crossings and underground cable construction must be built from the newly built Neuwiedenthal rectifier plant into the track field. The long-distance railway line 1720 has to be crossed. The aim of the crossing is the power rail connections on route 1271.