Buildings with mechanical engineering and electrical engineering Buildings with mechanical engineering and electrical engineering
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Buildings with mechanical engineering and electrical engineering Buildings with mechanical engineering and electrical engineering
The northern part of Runway 18 West is qualified for drainage. For this purpose, drainage channels must be constructed on both sides of runway 18 West to drain away the rainwater that accumulates (primary drainage), including necessary work on cable protection pipe routes and train shafts, a secondary drainage system to drain away the collected rainwater, a storage structure to retain the collected and drained rainwater, a lifting system and a north-west cable route under runway 18 West. All measures must be carried out during ongoing flight operations, some of which involve night work. This award package includes the production of the lifting system, the storage basin with slide shaft and the associated mechanical and electrical equipment. The project includes the construction of a lifting system to pump rainwater from the northern area of runway 18 West to the southern area as well as the construction of a storage basin with a slide shaft. Overview of services: Production of a lifting system as an in-situ concrete structure (LxWxD) 4.95 m x 4.95 m x 10.50 m included - 2 submersible motor pumps each for winter and summer operation - ventilation, covers, intermediate grating level - level measurement - grounding and lightning protection - power and data connection Production of a storage tank as a round tank with 2 chambers and a total volume of 1500 m³, outer diameter 25m as an in-situ concrete structure Production of a slide shaft as an in-situ concrete structure (LxWxD) 7.40 x 4.70m x 3.30 m Mechanical and electrical equipment for storage basins and slide shaft as well as earthing and lightning protection systems Approx. 1,000 m2 of sheet pile wall shoring with underwater concrete base Approx. 3,000 m2 of topsoil removed, stored, covered again and Sowing approx. 2,500 m3 Soil excavation approx. 2,200 m3 Soil disposal Laying pressure pipes (DN 200, DN 450 and DN 600) Measures for groundwater management (open dewatering) Adaptation of the existing EMSR concept and commissioning of the entire system Steel construction work (stairs, railings, etc.)
Related Procurement Opportunities
Similar tenders in Construction materials, Engineering, Infrastructure and construction