Mission Maîtrise dœuvre en vue de la mise en production dune nouvelle ressource à partir de la boucle des Maillys, du traitement et du transport de leau potable (21). Project management for the production of a new resource from the Boucle des...
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Mission Maîtrise dœuvre en vue de la mise en production dune nouvelle ressource à partir de la boucle des Maillys, du traitement et du transport de leau potable (21). Project management for the production of a new resource from the Boucle des Maillys, the treatment and transport of drinking water (21)
It is planned to be broken down into sections. The contract includes a firm tranche and 7 optional tranches defined below: FIRM TRANSFER - Project studies (PRO) OPTIONAL TRANSFER - Tranche no. 1: – Assistance for the award of public works contracts (AMT) - Tranche no. 2: – VISA – Directorate of Execution of Works (DET) and Scheduling, management and coordination of the site (OPC) – Assistance during reception operations (AOR) and during the period of guarantee of perfect completion (GPA) - Tranche no. 3 – Assistance for studies and related works - Tranche no. 4 – Procedures and obtaining administrative authorizations - Tranche no. 5 – Procedures and obtaining authorization for the drinking water treatment plant and discharge management - Tranche no. 6 – Assistance in finding and subscribing to Structure Damage Insurance - Tranche no. 7 – PGSSE The team of project management must include the following minimum skills: - Hydraulics: Sizing of water intakes, pumping, - Treatment of drinking water: Design of factories, - Hydraulic civil engineering: Structures: factory, recovery stations, - Networks and pipelines: Sizing, layout, hydraulic modeling, pressure management, - Project management skills: Management of project management missions, Multi-company coordination, Planning, Work monitoring (DET, OPC, AOR) The project management mission concerns: - works of type: Infrastructure - works of type: New construction Estimated cost of the work: €64,278,660 excluding tax
Related Procurement Opportunities
Similar tenders in Water and Sanitation, Environment And Pollution, Construction materials