Construction Manager at Risk (CMAR) Consultancy Services for the Glenridge Avenue CNR Bridge Replacement Project
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
This Request for Proposals (the “RFP”) is an invitation by the Regional Municipality of Niagara (“Niagara Region”) to prospective proponents to submit proposals for Construction Manager at Risk (CMAR) Consultancy Services for the Glenridge Avenue CNR Bridge Replacement Project, as further described in Section A of the RFP Particulars (Appendix B) (the “Deliverables”). The Region will be delivering this project using a Construction Management Contract - for Services and Construction (CCDC 5B) model, also known as Construction Manager at Risk (CMAR). The Region will select the Design Consultant first with this RFP (herein referred to as the “Successful Proponent”) and the CMAR selection to follow. The Successful Proponent will be responsible for delivering the overall design of the project in addition to coordinating and overseeing CMAR processes across this project. The CMAR will be brought on early in the design phase and will provide its own advisory services to the project team. The Successful Proponent will be responsible for but not limited to the following: • Engineering Design, Contract Preparation and Project Management • Pre-Construction Phase Support, and • Contract Administration, Inspection This RFP is being issued to the Successful Roster Listing developed from Contract 2025-RFSQ-50.