Heart of Neuvillers village
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
This contract is a works contract. The project consists of the renovation of the roads Rue Notre-Dame, Rue du Centre, Rue Courte, Rue de Grandvoir, Rue de Rossart and Coin du Woet in the village of Neuvillers. The replacement of the Rue de Rossart water distribution pipe in PVC DN 90 is also included in the file as well as the repair of the rubble retaining walls in the center of the village. The contract includes the following works in particular: • Carrying out the inventory; • Site installation, including preliminary surveys and surveys; • Demolitions including transport and storage of the product of this work; • Excavation and embankment earthworks; • Earthworks in excavations and embankments for the creation of trenches and various excavations; • Milling and/or demolition of road surfaces; • Reprofiling, leveling and compacting existing foundations; • Carrying out purges; • The supply and installation of (sub)foundation stonework; • The supply and installation of hydrocarbon coatings; • The supply and installation of paved pavement coverings; • Regrading the shoulders; • The installation of linear elements and their foundation; • The supply and installation of pipes: PVC pipes DN 90; • The installation of earth and CVa devices; • The construction of associated works in reinforced concrete and masonry; • Reconnection or renewal of particular connections; • Installation of vertical signage; • Installation of road markings; • The restoration of elements damaged as a result of the work; • Maintenance of the work according to legal and regulatory requirements during execution and the warranty period; • Removal of excess debris and waste; • Miscellaneous (safety documents, As-built plans, etc.). The site is classified into: • 3rd category – site severely obstructing traffic • 4th category – site outside the