Poland – Architectural, construction, engineering and inspection services – Preparing design documentation and providing author's supervision for the task entitled: Construction of a collision-free crossing of the E65 railway line (railway line No. 9) in the area of ul. Boczna in Gdańsk.
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
1. The subject of the order is the preparation of design documentation and author's supervision for the task entitled: Construction of a collision-free crossing of the E65 railway line (railway line No. 9) in the area of ul. Boczna in Gdańsk, along with obtaining the necessary administrative decisions (including ZRID) or submitting notifications allowing construction works to be carried out. The documentation should be prepared on the basis of the spatial program and spatial concept (KPP) implemented in January 2026 for the construction of a collision-free crossing of the E65 railway line (railway line No. 9) in the area
Related Procurement Opportunities
Similar tenders in Engineering, Infrastructure and construction, Railways