Get Free Access
TZ Ref No.: TZ-1195233
Contract Award Awarded Contract National (NCB) United States Water and Sanitation Environment And Pollution Construction materials

South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion Progressive Design-Build (PDB)

Doc ref no. 191BWC24C0006P00001
Sector Water and Sanitation, Environment And Pollution, Construction materials
Contract Date 14 Oct 2026
Contract Value $ 552.4M
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Contract Description

Award Notice South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion Progressive Design-Build (PDB)
The purpose of this modification is to incorporate additional construction packages and Phase 1 expansion work into the progressive design-build contract. The modification adds the following construction packages:
Early Work Package (EWP) 1C – Replacement In Kind
Final Construction Price: $13,147,453
Scope includes:
Removal and replacement of existing roofs.
Replacement of process equipment and piping.
Replacement of electrical equipment.
Replacement of odor control media.
Installation of new window sealants.
Replacement of coiling doors.
Replacement of emergency showers and eyewashes.
Painting and coating of existing facilities.
Early Work Package (EWP) 3B – Early Procurement
Final Construction Price: $25,693,528
Scope includes procurement of critical long-lead equipment, including:
Standby generators and associated switchgear.
Medium-voltage switchgear.
Positive displacement blowers.
Submersible solids-handling pumps.
Dewatering centrifuges.
Stainless steel slide gates.
Stop logs.
Early Work Package (EWP) 4 – Major Concrete Structures
Final Construction Price: $37,468,188
Scope includes:
Construction of major concrete structures for new Headworks facilities.
Primary Sedimentation Tanks 6 and 7.
Storage Warehouse.
New influent and drainage infrastructure.
Associated piping, carpentry, architectural, mechanical, electrical, and support features.
Phase 1 Base Construction Expansion
Final Construction Price: $369,613,306
Scope includes:
New Headworks facility with integrated pump station.
Screening and grit removal systems.
Primary sedimentation expansion.
Centralized odor control facilities.
Waste activated sludge thickening and storage facilities.
Dewatering upgrades.
Lime storage/feed and truck loadout facilities.
Storage warehouse.
Chlorination storage facility.
Administrative building expansion.
Multiple electrical buildings.
New electrical service, generators, utility distribution systems, process piping, and site work.
Rehabilitation of existing activated sludge tanks and lime silos.
Engineering services during construction and procurement of the effluent meter and bypass piping.
Construction Allowances
The contract also increases CLIN 008 Construction Allowances by $9,804,886, increasing the allowance amount from $1,783,374 to $11,588,260 to address uncertain construction elements and field conditions associated with EWP-1C and Phase 1 construction activities. [191BWC24C0008 P00012 | PDF]
Period of Performance
The base construction period of performance has been revised to 1,643 calendar days (54 months) from issuance of the Base Construction Notice to Proceed (NTP). Construction closeout requirements remain unchanged and must be completed within 180 calendar days following construction completion.
Award Value
Previous Contract Value: $106,449,546
Modification Increase: $445,922,475
Revised Total Contract Value: $552,372,021

Days to Deadline
87 days
Closing: 13 Jan 2027, 00:00

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 191BWC24C0006P00001
Notice Type Contract Award
Contract CPV 15981000, 45252140, 14100000
Contract Project Location United States
Contract Value $ 552.4M
Contract Date 14 Oct 2026
Contract Deadline 13 Jan 2027

Buyer Contact Information

Contact Details Locked

Nodal officer email, telephone, and website coordinates are unlocked upon free sign up.

Unlock Contact Details (Free) →