Poland – Turbine generator sets – "Installation of a hydropower system for the recovery of electricity from water discharged from the surface to level 795 via a DN 200 pipeline, along with connecting the installation to the power grid and fire protection installation of the LW Bogdanka mine in the Bogdanka field" - in accordance with the provisions of the SWZ
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
1. The subject of the order is the development of a hydropower system for the recovery of electricity from water discharged from the surface to level 795 via a DN 200 pipeline, along with connecting the installation to the power grid and the fire protection installation of the LW Bogdanka mine in the Bogdanka field - in accordance with the provisions of the SWZ 2. A detailed description of the subject of the order is included in Part III of the SWZ Description of the Subject of the Order. 3. The contract in question is a sectoral contract within the meaning of Art. 7 point 35) of the Public Procurement Law.
Related Procurement Opportunities
Similar tenders in Water and Sanitation, Energy, Power and Electrical, Fire Safety and Security