Safety coordination and health protection missions for level 2, 3 and 3+ operations - 4 lots
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Safety and health protection coordination missions for level 2, 3 and 3+ operations - 4 lots The purpose of the contract is to carry out Safety and Health Protection Coordination missions for level 2, 3 and 3+ operations - 4 lots within the framework of: - road developments, sanitation and related works such as soil decontamination in the 59 municipalities of the Metropolis (lot 1), - building operations and related works such as that the depollution of the soil in the 59 municipalities of the Metropolis (lot 2), - operations to develop public spaces and work on specific structures (purification plants, engineering structures excluding tunnels) and related works such as decontamination of the soil in the 59 municipalities of the Metropolis (lot 3), - operations of the 6 tunnels and expressways for Lyon 1st, 3, 4, 5, 6, 7, 9, Feyzin, Vénissieux, Corbas, Chassieu, Rillieux-la-Pape, Villeurbanne, Caluire, Bron, Saint-Fons, Solaize, Irigny, Vernaison, Charly, Sainte-Foy-lès-Lyon, Oullins, Pierre-Bénite, La Mulatière, Meyzieu. SPS (Health Protection Safety) coordination is a sovereign mission, which is imposed on the project owner and which he must manage, which targets the project (design) and construction (construction) phases of building and public works operations. Its purpose is to manage the joint activity of companies in terms of safety on construction sites (construction phase) and to integrate upstream the consideration of safety in the design of works to improve subsequent intervention conditions, based on the nine general principles of prevention. The function of SPS Coordinator includes 3 levels of skills in coordinating preventive measures for building and civil engineering operations. The following market targets level 2 and 3 operations Road development, sanitation and related works Building operations and related works Public space development