Drinking water treatment plant (TWA) Eiweiler - sub-measure: Supply line to the drinking water treatment plant (TWA), 3rd BA (forest area) Drinking water treatment plant (TWA) Eiweiler - sub-measure: Supply line to the drinking water treatment...
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Drinking water treatment plant (TWA) Eiweiler - sub-measure: Supply line to the drinking water treatment plant (TWA), 3rd BA (forest area) Drinking water treatment plant (TWA) Eiweiler - sub-measure: Supply line to the drinking water treatment plant (TWA), 3rd BA (forest area)
The Nonnweiler Dam Association (TVN) is planning to build a raw water pipeline from its service water pipeline (BWL DN 1000) in Primstal to the Eiweiler drinking water treatment plant (TWA Eiweiler) that is under construction and to the Primstal pressure booster plant (DEA Primstal). The award unit VE10_2 - pipeline construction, earthworks essentially includes the following construction work: • Construction site setup and work in the construction area • Traffic safety and traffic regulation • Safety and preparatory work • approx. 480 m² of shoring work • approx. 2,600 m of pipeline construction DN 600 • approx. 6,990 m³ of soil for water pipe trench • approx. 2,602 m Cable protection pipes • Inspection work • Restoration work
Related Procurement Opportunities
Similar tenders in Water and Sanitation, Environment And Pollution, Construction materials