Germany – Construction work – Electrical and data installation – main building Dornheimer Weg 24
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The building with an inner courtyard was originally planned and built as a workshop in the 1960s. In the mid-1970s an addition was made so that the building now consists of 4 floors. After a change of use in 2012, it is now an administration building. The building will remain partially operational during construction. The basement contains mostly workshops and storage areas. The remaining floors mainly contain office space and a canteen. The construction project is divided into 4 construction phases from the basement to the 2nd floor. This means parallel operation