Germany – Medium-voltage installation work – 62-2026-777-EA - Laying the power and fiber optic cabling in the empty pipe pull system - MU4 and MU2, ATV DIN 18322 and 18382
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The contract includes the creation of the infrastructure for the power and data supply of the building complexes MU4 and MU2, starting from the energy center. The main services are the laying of the required medium-voltage cables (approx. 885 m), low-voltage cables (approx. 3,060 m) and fiber optic cables (approx. 2,765 m) in the existing empty conduit pull system. This also includes the delivery, installation and subsequent dismantling of a temporary transformer station (800 kVA) as well as the delivery and installation of 11 low-voltage distribution boards and 11 network cabinets including
Related Procurement Opportunities
Similar tenders in Energy, Power and Electrical, Telecommunications