Get Free Access
TZ Ref No.: TZ-1001083
Contract Award Awarded Contract 🌍 International (ICB) Bulgaria Construction materials Infrastructure and construction Engineering

Preparation of a complex report for the assessment of compliance with the basic requirements for construction and exercise of construction supervision during the construction of objects: inter-block space on Pristanishtna street opposite PI 44238.505.1011, public area for short-term stay and recreation Chuchurkata, locality Bahchite (PI 44238.190.57, PI 44238.190.53 and PI 44238.190.54), as well as interblock.. Preparation of a complex report for the assessment of compliance with the basic requi

Doc ref no. 00598283-2026
Sector Construction materials, Infrastructure and construction, Engineering
Contract Date 01 Sep 2026
Contract Value Undisclosed
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Contract Description

Preparation of a complex report for the assessment of compliance with the basic requirements for construction and exercise of construction supervision during the construction of objects: inter-block space on Pristanishtna street opposite PI 44238.505.1011, public area for short-term stay and recreation Chuchurkata, locality Bahchite (PI 44238.190.57, PI 44238.190.53 and PI 44238.190.54), as well as interblock.. Preparation of a complex report for the assessment of compliance with the basic requirements for construction and exercise of construction supervision during the construction of objects: inter-block space on Pristanishtna street opposite PI 44238.505.1011, public area for short-term stay and recreation Chuchurkata, locality Bahchite (PI 44238.190.57, PI 44238.190.53 and PI 44238.190.54), as well as interblock ..
The subject of the order is Preparation of a complex report for the assessment of compliance with the main requirements for constructions and the exercise of construction supervision during the construction of objects:interblock space on Pristanishtna street opposite PI 44238.505.1011, public area for short-term stay and recreation Chuchurkata, locality Bahchite (PI 44238.190.57, PI 44238.190.53 and PI44238.190.54), as well as inter-block space between the RSPBZN building and the adjacent streets - Pristanishtna Street, Knyaz Ivan Kulin Street and Hristo Botev Street (PI 44238.505.6060), within the scope of Activity3 Green urban infrastructure in the city of Lom under project No. BG16FFPR003-2.006-0109-C01 Combined integrated territorial investments (ITI), financed under the Regional Development Program 2021-2027.The subject of the public procurement includes the following activities: Activity 1: Preparation of a complex report for assessing the compliance of investment projects with the basic requirements for constructions,according to Art. 166, para. 1, item 1, pre. 1 in connection with Art. 142, para. 6, item 2 of ZUT, in the mandatory scope regulated in art. 142, para. 4, para. 5 and para. 9 of the ZUT; Activity 2: The activities related toexercise of construction supervision, as well as with the implementation of inspection and control of the supplied and used construction materials, coordination of the construction process until the introduction of the object ofintervention in operation, all regulated in art. 166 and Art. 168 of the Territorial Planning Act /ZUT/, as well as the responsibilities arising from Art. 178 of the ZUT. The consultant is obliged tofulfills the mandatory scope of activities, in accordance with the requirements of the Law on Territorial Planning, the requirements of Ordinance No. 3 of 2003 for drawing up acts and protocols duringconstruction, taking into account the requirements of the Ordinance on essential requirements for constructions and assessing the compliance of construction products and all legal and by-laws inthe field of construction in Bulgaria. The following objects are included in the scope of this public procurement: inter-block space on Pristanishtna street opposite PI 44238.505.1011, public areafor short-term stay and recreation Chuchurkata, area Bahchite (PI 44238.190.57, PI 44238.190.53 and PI 44238.190.54), as well as inter-block space between the RSPBZN building and the adjacent streets -Pristanishtna Street, Knyaz Ivan Kulin Street and Hristo Botev Street (PI 44238.505.6060), planned for the construction and development of green urban infrastructure on the territory of the town of Lom within Activity 3Green Urban Infrastructure in Lom under project No. BG16FFPR003-2.006-0109-C01 Combined Integrated Territorial Investments (ITI), financed under the Regional Development Program 2021-2027.The grounds represent urbanized spaces with potential for the development of elements of green urban infrastructure, which are currently characterized by unsatisfactory technical andoperating condition. The existing pavements are partially or completely compromised, made in separate sections of amortized asphalt, earth or crushed stone coverings with disturbedflatness, with local depressions, unevenness and lack of effective surface drainage leading to retention of atmospheric water. In a significant part of the range they are absent or strongly presentdepreciated landscaping elements - alleys, sidewalks, curbs, recreation areas, as well as functionally designed green areas, with the existing vegetation partially degraded and disorganized.Общата индикативна площ на обектите, предмет на интервенция, възлиза приблизително на 7 259 кв.м., разпределена между отделните терени, както следва: междублоково пространство по ул. „Пристанищна“ –about 2,190 sq.m., Chuchurkata area - 3,301 sq.m. and inter-block space in the RSPBZN area - about 1,768 sq.m. A detailed description of all planned activities is contained in the attachedдокументацията техническа спецификация

Days to Deadline
43 days
Closing: 30 Nov 2026, 00:00

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 00598283-2026
Notice Type Contract Award
Contract CPV 14100000, 45000000, 74200000
Contract Project Location Bulgaria
Contract Value Undisclosed
Contract Date 01 Sep 2026
Contract Deadline 30 Nov 2026

Buyer Contact Information

Contact Details Locked

Nodal officer email, telephone, and website coordinates are unlocked upon free sign up.

Unlock Contact Details (Free) →