Multi-disciplinary documentation of the renovation of the mechanical ventilation system of the Control Room and the adjacent social room at the Plant Wastewater Treatment Plant in the Gdańsk Refinery
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Detailed description of the subject of work for the task "Multi-discipline documentation of the renovation of the mechanical ventilation system of the Control Room and the adjacent social room at the Wastewater Treatment Plant in the Gdańsk Refinery" 1. Scope - Detailed design in the sanitary industry together with the accompanying scope of construction works and a design in the electrical and control industry, including: A) Inventory of existing ventilation and duct air-conditioning systems serving the above-mentioned rooms and places of potential collisions (beams and existing installations). This inventory will be carried out for the purposes of designing and locating the supply and exhaust actuators, duct routes and accompanying installations in which the ventilation ducts will be routed (including in the spaces between the ceilings, above the suspended ceiling and for the purposes of possible additional passages and locations in the zones outside the suspended ceilings).
B) Renovation, including the demolition and liquidation of the existing ventilation system and the design of a new supply and exhaust mechanical ventilation installation. The designed ventilation system is based on an air handling unit (AHU standard - TROX or SWEGON for outdoor units, possibly additionally Systemair, ClimaGold for indoor units) with an electric heater and cooler cooperating with the unit (DAIKIN / FUJITSU standard). The documentation should include the design of a new system of insulated ventilation ducts (equipped with attenuating sections) and executive elements (supply/exhaust using swirl diffusers with plenum boxes intended for installation in the suspended ceiling space), as well as the power supply and automation of the system serving the Control Room of the Plant Wastewater Treatment Plant and the adjacent social room. For the social room, it is planned to use only the air supply from the new air handling unit + design an independent exhaust