Procurement and Installation of Phase 1 Sanitary Landfill Power Supply System (CENRMO).
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
1 lot MAIN POWER DISTRIBUTION PACKAGE -1 set 125mm2 THHN/THWN -2(50m) - Php84,925.001 set 38mm2 THHN/THWN-2 (1.5roll) - Php111,375.001 set 8.0mm2 THHN/THWN-2(1.5roll) - Php 23,300.001 set Electrical Conduit, 38mm? with connector (15lenght) - Php4,275.001 set Electrical Conduit, 63mm? with connector (8lenght) - Php 3,000.001 set Electrical Conduit, 63mm? with connector (35lenght)- Php 6,125.001 lot Accessories and Consumable - Php12,000.00Including site delivery1 set MAIN DISTRIBUTION PANEL SYSTEM COMPLETE ASSEMBLY - MDP, 250A, MCCB.3P,230V,60HZ, Nema-3R with grounded Busbar LED, 3 holes LUGs for incoming BRANCHES:-2-125A MCCB,2P,230V-1-80A MCCB,2P,230V-with complete busbar assembly & mounting accessories-including delivery1 lot SUB-PANEL SYSTEM COMPLETE ASSEMBLY -Panel -1, 125A, 2P,230V, 4 ways, Nema-3R with ground busbar BRANCHES:-1-40A MCCB, 2P, 230V-3-30A MCCB, 2P,230V-with complete busbar assembly & mounting accessoriesPanel -1, 125A, 2P,230V, 4 ways, Nema-3R with ground busbar BRANCHES:-4-40A MCCB, 2P, 230V-with complete busbar assembly & mounting accessories-Including site delivery1 lot GROUNDING SYSTEM COMPLETE ASSEMBLY --Ground Rod, copper, 5/8ồi 10 with clamps cable-Secondary rack, 2-spool, heavy duty with mechanical support-Service Head Cap-Including Site Delivery1 lot INSTALLATION & SYSTEM COMMISIONING - Includes:*Labor (15 days)1 Foreman4 Skilled Workers4 Laborers*Equipment use:Electric Drill•Electric CutterMegger TestingIncluding site delivery, Testing & Commissioning***************************************************************Purpose: For the phase I upgrading of the sanitary landfill power supply system, including the installation of power distribution lines, main and sub-panel systems, and grounding protection. Delivery / Contract Period: 60 Day/s
Related Procurement Opportunities
Similar tenders in Energy, Power and Electrical