Installing HT heat pumps for sanitary hot water
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Currently, sanitary hot water production on the Kortenberg campus is done with boilers or heat exchangers in the substations connected to the internal heating network. In 12 substations, these boilers or heat exchangers will be replaced by new boilers that are heated with high-temperature heat pumps. The works include: • The demolition of the existing installation • The supply and installation of outdoor units including environmental works • The supply and installation of the indoor installation (buffer tanks, boilers, piping, automation, etc.) • Carrying out construction work for the above. • The hydraulic adjustment of the installation • Switching from the existing to the new sanitary hot water production with a minimum of interruption (Maximum four hours) • Maintenance during the warranty period The assignment is further described in the chapter 'Technical provisions'