MP-200045, Grenchen connection: bypass / geology specialist mandate
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
At the Grenchen connection, there is congested traffic in both directions during peak hours between the motorway connection and the Archstrasse/Flughafenstrasse junction. The backlog extends beyond the two nodes and extends beyond the exit ramp. For these reasons, a bypass should be implemented at the Grenchen connection on the N05 and at the Arch-/Flughafenstrasse junction. In addition, the approach of a separate slow-traffic bridge is to be examined and the two roundabout structures are to be repaired. The subject of the advertised mandate is the geology/hydrology services for the DP phases - commissioning. For the detailed service description, see tender documents.