Netherlands – Engineering works and construction works – 31148903 project Wilhelminakanaal Sluis II
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The contractor must essentially perform the following activities: • demolition and reconstruction of the Schutsluis at Lock Complex II; • new construction of pumping station at Sluis Complex II; • completion of the canal building between Lock Complex II (SX2) and Lock Complex III; • upgrading of the canal building inflow from Donge to Lock Complex II; • adjustment to the current level of Voorhaven downstream and pumping station/hydroelectric power station at Lock Complex III; • dismantling of fast cycle path; • bank design based on EPvE; • maintenance during implementation up to 1 year after Sluis II with local and remote operation will be trouble-free for 2 months