HVAC Renovation Phase 4 - McLeod Building/Bldg S - Downtown Campus
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
HVAC Renovations Phase 4 - Building S - Design Build Services for selective HVAC renovation of one floor and controls upgrades for another floor at CFCC's Building S - Downtown Campus, Wilmington, NC. Cape Fear Community College is seeking proposals from qualified Design Build HVAC teams to design and construct major HVAC Renovations for this building, located at CFCC’s Wilmington NC Campus. The Existing building is 7 floors, 114,000sf. Desired scope is replacement of VAV’s, hot water coils and control dampers on existing dual deck or multizone HVAC system on one floor (Floor #2) of the building. Also, replace DDC controls on existing AHU’s on the ground floor. Work to include DDC controls, hot water piping from building riser to VAV’s, grilles, outside air dampers and actuators, fire dampers and other required accessories. Upgrade air handlers from starters to VFD’s. Install extended outdoor boiler flues Associated removal and replacement of ceiling grid and tile. One firm will be selected for the entire project.