Order: Brno, Olomoucká IV – reconstruction of the water supply
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The subject of the construction works is the reconstruction of the water supply in the part of Olomoucká street, between Těžební street and the bridge over the railway. The water supply line of the DN 150 profile from 1926 will be reconstructed with a total length of 544.8 m. At the same time, the water supply connections will be replaced with a total length of 135.8 m. During the construction period of the water supply reconstruction, the replacement water supply will be provided through a temporary water supply. The street drains located in close proximity to the trench for the reconstructed water supply will be retroactively restored. After the works on the water supply have been carried out, the communication areas will be restored to the necessary extent. More detailed information about the execution of the construction can be found in the project documentation. Place of performance: Brno Procedure regime: mimo režim ZZVZ Awarded to: IMOS Brno, a.s. Awarded contract value: 23,873,863.00 CZK