Tf-07-c1_stormwater drainage system on sheikh zayed bin hamdan road connecting developers
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
1: tf-07-c1: construction of stormwater drainage system on sheikh zayed bin hamdan road connecting developers - 1 each
note: part - a - general items -
note: contractual requirements -
a: performance security
note: bidder is not required to price this item; the amount will be calculated automatically according to the equations in the grand summary and will be included in the bidder’s total price. all conditions and requirements mentioned in the preamble shall apply.
performance security amount = 0.3% x (number of quarters of construction period including dlp) x (bidder price) x 10% (performance security amount)
refer preamble clause b/6/e - 1 sum
b: insurance of the works
note: bidder is not required to price this item; the amount will be calculated automatically according to the equations in the grand summary and will be included in the bidder’s total price. all conditions and requirements mentioned in the preamble shall apply.
the insurance of work amouint = 0.15% of the bidder price.
refer preamble clause b/7/a
- 1 sum
c: third party liability insurance - 1 sum
d: workmens compensation insurance - 1 sum
note: specified requirements -
note: accommodation for the engineers staff -
e: establishment of offices for the engineers staff - 1 sum
f: maintenance of offices for the engineers staff - 900 day
g: removal of offices for the engineers staff - 1 sum
note: services for the engineers staff -
h: four-wheel drive ac pickup vehicle with driver & fuel for laboratory testing - 900 day
j: telephone, telefax and internet facilities - 900 day
k: set of progress photographs - 30 month
note: equipment for use by the engineers staff -
l: establishment of office equipment - 1 sum
m: maintenance of office equipment - 900 day
n: removal of office equipment - 1 sum
p: establishment of surveying equipment (prior specific approval from engineer to be obtained) - 1 sum
q: maintenance of surveying equipment - 900 day
r: removal of surveying equipment -...