Get Free Access
TZ Ref No.: TZ-1016835
Contract Award Awarded Contract 🌍 International (ICB) Poland Water and Sanitation Environment And Pollution Construction materials

Intelligent management and monitoring of water supply infrastructure in the Gidle Commune Intelligent management and monitoring of water supply infrastructure in the Gidle Commune

Doc ref no. 00621344-2026
Sector Water and Sanitation, Environment And Pollution, Construction materials
Contract Date 10 Sep 2026
Contract Value Undisclosed
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Contract Description

Intelligent management and monitoring of water supply infrastructure in the Gidle Commune Intelligent management and monitoring of water supply infrastructure in the Gidle Commune
The subject of the order is the delivery and implementation of an intelligent system for managing and monitoring water supply infrastructure as part of the investment task titled: Intelligent management and monitoring of water supply infrastructure in the Gidle commune. 2. The scope of delivery includes: 1) a monitoring and analysis system for the water supply network, consisting in the delivery and replacement of water meters with intelligent ones, together with software for readings and management in residential buildings, business premises, public utility facilities and a water supply station, with intelligent measuring devices with communication modules, enabling a comprehensive analysis of the condition of the water supply network. Number of devices: a) single-jet, dry-running water meter, equipped with a radio module for remote reading, DN 20 - 2173 pieces, including: - water meter wells that do not require a passive antenna - 2123 pieces. - water meter wells requiring a passive antenna - 50 pieces. b) ultrasonic water meter, equipped with a radio module for remote reading, DN25 - 7 pieces, including; - not requiring a passive antenna - 4 pcs. - requiring a passive antenna - 3 pcs. c) ultrasonic water meter, equipped with a radio module for remote reading DN32 - 9 pcs; d) ultrasonic water meter, equipped with a radio module for remote reading DN40 – 5 pieces; e) ultrasonic water meter, equipped with a radio module for remote reading DN100 - 1 piece, f) screw water meter for measuring wells at intakes DN100 with a GSM recorder, as an element of the system for intelligent management of the water supply network - 1 piece g) software for reading and managing data (mobile application and management platform) with a reading set (smartphone, scanner, antennas, head); 2) system for intelligent management of the water supply network, including: installation of telemetry set – set 10 pcs. and monitoring system. A system consisting of measurement of key sections of the network and important points, such as water intakes, which will contribute to the optimization of water transmission and quick detection of areas of excessive consumption and places of potential failures, efficiency of network operation and faster removal of problems, ensuring its appropriate pressure and quality. 3) spatial information system (GIS) enabling central management of data regarding the water supply network, which will allow for effective management of water resources, searching, identifying, categorizing, advanced symbolization, creating statistics, generating printouts, keeping records, tracking and notifying about changes, planning maintenance, taking measurements, providing attachments, notes and reports, as well as making analyzes and comparisons, quick visualization and location of objects and events on the network, which will significantly increase the availability and knowledge about water supply infrastructure. The GIS system as an organized environment will include server software, with multi-station access (desktop) via a web browser (www) with a central database, for entering, collecting, processing and visualizing spatial and descriptive data enabling central management of data regarding the water supply network, such as pipe location, technical parameters, repair history or water quality data; 4) a mathematical model of the water distribution system - network backbone - showing the locations of facilities and water meter data used to locate water recipients in order to load the network backbone with the resulting distributions; technical data of key hydraulic facilities located in the network, e.g. pumps, tanks, gate valves, intakes, reducers; hydraulic settings of objects, control rules, pump curves, device operation schedules. 5) installation of drinking fountains - 3 pieces. 3. A detailed description of the subject of the order and the scope of work to be performed by the Contractor is attached as Appendix No. 1 to the SWZ. 4. The devices should be brand new, have a warranty, and a catalog card confirming the technical parameters of the water meters. 5. The scope of the subject of the order also includes the performance of all dismantling works. Materials from dismantling, as part of the contractual remuneration, the Contractor is obliged to dispose of waste in accordance with legal regulations, including security and cleaning works, systematic removal of the resulting waste to a licensed waste dump, along with documentation of this removal. The waste management process will be carried out by the entity carrying out the work itself or will delegate the task to specialized entities that will include the actual costs associated with waste management and disposal in the price of the service. 6. Other obligations of the Contractor 1) Equipment and delivery vehicles used to complete the order must be powered/charged from renewable energy sources. The Ordering Party allows vehicles of the following types: BEV Battery Electric Vehicle), PHEV (Plug-in Hybrid Electric Vehicle), FCEV (Fuel Cell Electric Vehicle),EREV (Extended Range Electric Vehicle). The equipment and vehicles used to implement the project must have the necessary technical tests. Any identified use of tools, including delivery vehicles, that is inconsistent with the above provisions will result in the imposition of a contractual penalty in accordance with the contract. 2) The contractor is obliged to deliver and install the subject of the order fully adapted to people with disabilities and special needs - in accordance with applicable regulations, including the Act of July 19, 2019 on ensuring accessibility for people with special needs, in particular Art. 6. 7. The order is implemented as part of the project Intelligent management and monitoring of water supply infrastructure in the Gidle Commune, which is co-financed by the European Regional Development Fund under the regional program European Funds for Łódź 2021-2027. FELD contract number. 02.12-IZ.00-0008/24-00

Days to Deadline
53 days
Closing: 09 Dec 2026, 00:00

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 00621344-2026
Notice Type Contract Award
Contract CPV 15981000, 28111500, 14100000
Contract Project Location Poland
Contract Value Undisclosed
Contract Date 10 Sep 2026
Contract Deadline 09 Dec 2026

Buyer Contact Information

Contact Details Locked

Nodal officer email, telephone, and website coordinates are unlocked upon free sign up.

Unlock Contact Details (Free) →