Clarkson Wastewater Treatment Plant Primary Clarifier No. 3 Travelling Bridge Replacement, Project 14-2930
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The Clarkson WWTP Primary Clarifier No. 3 Travelling Bridge Replacement project (Tender 2026-229T, Project 14-2930) involves replacing the existing travelling bridge mechanism with a new single-drive travelling bridge system, new control panel, and full integration with the plant SCADA system via a dedicated wireless gateway; the scope also includes removing existing equipment, replacing auxiliary components (running rails, conductor bar system, scum cross-collector, inlet baffles, scum baffles, weir plates, and groundwater flap gates), structural rehabilitation of the PC3 tank and Tunnel ‘F’(expansion joint sealant replacement, crack injection, and localized concrete repairs), and associated electrical distribution modifications from MCC-6. The bid document will be posted https://peelregion.bidsandtenders.ca when available. This procurement is issued in accordance with the terms of the Comprehensive Economic and Trade Agreement (CETA), Canadian Free Trade Agreement (CFTA), and other applicable trade agreements.