Renovation of vacant apartment no. 14 in the "DESIGN AND BUILD" system in the building at ul. Szymanowskiego 10 in Wałbrzych.
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
I. General description of the subject of the order 1. As part of the implementation of the subject of the order, the Contractor will be obliged to develop design documentation in the "design and build" system and, based on it, will renovate residential premises No. 14. All existing installations are subject to replacement. Moreover, in accordance with applicable regulations, a bathroom with a toilet should be introduced into the apartment and gas central heating with a dual-function condensing boiler should be installed, ensuring proper supply and exhaust ventilation. 2. The mentioned residential premises are owned by the Wałbrzych Commune and are located in a multi-family residential building at ul. Szymanowskiego 10 in Wałbrzych, on the first floor. The building is owned by the Housing Community. The investment will be financed by the Gospodarstwa Bank National Project documentation must include the "Regulation of the Minister of Investment and Development of March 4, 2019 on standards regarding the spatial development of the building and its surroundings, construction technology and technical equipment of the building and the location of projects implemented with the use of financial support from the Subsidies Fund" in the field of energy saving and thermal insulation, specified in the Regulation of the Minister of Infrastructure of April 12, 2002 on the conditions they should meet. buildings and their location (Journal of Laws of 2015, item 1422, as amended) in relation to doors and windows. II. The Ordering Party's requirements in relation to the subject of the order 1. In terms of the structure of the premises, functional layout and surface balance · Existing balance: apartment no. 14 - 3 rooms, kitchen, bathroom with toilet. · The structure of apartment no. 14 will remain unchanged after the renovation: 3 rooms, kitchen, bathroom with toilet. 2. In terms of developing design documentation 1. Op