Germany – Switching station installation work – Building automation (KG 480)
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The Museum of Hamburg History at Holstenwall 24 in Hamburg was built between 1914 and 1922 and is a listed building. As part of the current construction project, the exhibition areas are being fundamentally renovated and restructured, as well as the technical building equipment being renewed. The building includes the following main uses: Lower ground floor: functional and storage areas, workshops, restoration rooms, office areas, depots, kitchen and technical areas (heating/cooling, air conditioning, plumbing, electrical). // Ground floor: areas for special and temporary exhibitions,