Removal of the tank The Commission shall adopt delegated acts in accordance with Article 21 of this Regulation
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Removal of the tank The Commission shall adopt delegated acts in accordance with Article 21 of this Regulation.
Reservoir disposal for Part 1 of 2025 up to a maximum of 34 000 000 Ft The tasks of the applicant: Disposal of unused reservoirs on site: removal of residual contaminants from reservoires, solvent cleaning of reservours, removal, necessary groundwork, transport and transfer of contaminated soil and other hazardous and non-hazardous waste to the controller, sampling and laboratory testing of soil and groundwater, preparation of the necessary documentation, monitoring of soil water wells as required by the public documentation of status, restoration of land to the total available framework. The applicant has defined below the quantity of equipment required for the disposal of the reservoir, based on the estimated quantity and the actual quantity, and the estimates of the quantities of these reservoids, as provided for in the public statistical documentation.
Related Procurement Opportunities
Similar tenders in Construction materials, Industry, Oil and Gas Product and Equipment