Switzerland – Engineering services – Repair of the bridge over SBB Pieterlen
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Due to structural defects, settlements and outdated standards, the bridge over the SBB in Pieterlen must be comprehensively repaired, the superstructure reinforced and the adjacent dam stabilized. The tendered engineering mandate is aimed at a renovation that enables a total useful life of 100 years from commissioning in 1980 and does not require any further structural maintenance measures for the next 25 to 30 years.