Germany – Heating, ventilation and air-conditioning installation work – Heating MBA - MBG, new building Martin-Behaim-Gymnasium
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
New construction of Martin Behaim High School Heating installation work MBA Sole/water heat pump 200 kW: approx. 3 pieces. Buffer tank 4,000 liters: approx. 3 pieces. High efficiency circulation pump: approx. 26 pieces. Double pump: approx. 3 pieces. Magnetite and mud separator: approx. 5 pieces. Line shut-off valves: approx. 168 pieces. Balancing valves: approx. 58 pieces. Ball valves: approx. 196 pieces. Balancing valves closed Differential pressure control valve: approx. 70 pieces. Differential pressure control valves: 70 pieces. Check valves: approx. 34 pieces. Flange dirt trap: 20 pieces. Installation of two-way/three-way valves: approx. 40 pieces. Heat meter: approx. 25 pieces.