Germany – Ventilation installation work – Extension GS Stickgrass - air conditioning systems
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The construction project is an extension of a primary school with 2 technical rooms, a cafeteria with warm-up kitchen and scullery, dining room with stage, sanitary rooms, storage and ancillary rooms, various classrooms and differentiation rooms and the administration rooms. The ventilation installation essentially consists of the following components: - 1 piece of supply and exhaust air unit with HRG, volume flow approx. 12,490 m3/h heating/cooling - 1 piece of supply and exhaust air unit with HRG as a kitchen device, volume flow approx.
3,132 m3/h - 1 piece of supply and exhaust air device with HRG, volume flow approx. 10,670 m3/h - approx. 72 St.