Germany – Architectural, construction, engineering and inspection services – BvA_TWP_Zweckverband Water Supply Bavarian Forest_ Expansion of the Moos waterworks
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The Bavarian Forest Water Supply, a public corporation in the form of a special-purpose association, supplies around 500,000 people in 7 districts with drinking water. Water production is based on two pillars, the Frauenau drinking water dam and the fountain field near Moos. Further information can be found on the website www.waldwasser.eu. The existing waterworks in Moos was rebuilt in 2018. The performance of the waterworks is now to be expanded. A second processing building must be built for this purpose. The new processing building will be built next to the existing one and includes the
Related Procurement Opportunities
Similar tenders in Engineering, Infrastructure and construction, Water and Sanitation