Get Free Access
TZ Ref No.: TZ-DAD57DB
Tender Notice Live Notice 🌍 International (ICB) Belgium Water and Sanitation Metals and Non-Metals

Piping adjustment works Activated carbon filters Oelegem 1

Doc ref no. PPP0•••
Sector Water and Sanitation, Metals and Non-Metals
Publish Date 29 Oct 2026
Estimated Value Refer Document
Tender Intelligence
Qualification analysis + key highlights for this procurement

TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Description & Project Overview

The assignment concerns adjustment work on the piping of the Activated Carbon Filters of the Water Production Center Oelegem 1. Activated carbon filters serve for the removal of dissolved organic micro-pollutants and tastes and odors from the water, through adsorption and biological degradation, in order to meet the quality requirements for drinking water production. The installation dates from the early 1990s and is still in service and consists of 12 filters. The piping consists of steel that has been coated on the inside and outside. This coating shows strong rust formation on the inside. There are cracks in the coating in various places on the outside, causing local corrosion. For the sake of necessary continuity of production, the works must be carried out in phases, over an estimated period of approximately 550 days. In this assignment, the piping must be dismantled where necessary. The parts that were concreted in need to be adjusted in some places. Stainless steel pipe parts must be inserted and welded through these concreted pipes. These stainless steel parts must then be connected to the adapted steel parts by applying flanges to both parts or a thickening on the stainless steel where it is connected with a stainless steel coupling. The modified pipework will be recoated via a separate order (not included in this contract). This is followed by installation and recommissioning of the filter. Communal facilities should also be treated in the same way. In some cases, the contractor must provide replacement parts in steel that can be used when the dismantled parts are recoated. These must be supplied directly to the coatings company. Unpredictability of drinking water demand and parallelism of coating mean that the contractor is required to be flexible when changing the planning without additional costs. One filter was already onion

Days to Deadline
12 days
Closing: 23 Nov 2026, 08:00
Register to Bid Check Bid Capacity
· · Alert

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Procurement Details

Doc ref no. PPP0•••
Notice Type Tender Notice
Bidding Type ICB
Publish Date 29 Oct 2026
Sector Water and Sanitation, Metals and Non-Metals
Bid Security Sign in to view

Buyer Contact Information

Contact Details Locked

Procurement contact email, telephone, and buyer coordinates are unlocked upon starting your 7-Day Free Pro Trial.

Start 7-Day Free Trial →