The Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 Facilities
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Award Notice The Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 Facilities
This is an A-E Synopsis in accordance with FAR 36.102. The Mission and Installation Contracting Command - Fort Drum is procuring Architect-Engineer (A-E) Design Services for the Modernized Pre-Mix and Nitrocellulose (NC) Dehydration Facilities at Radford Army Ammunition Plant (RFAAP). This procurement is conducted under the Brooks Architect-Engineer Act (40 U.S.C Section 1102) and Far subpart 36.102, which require that A-E contracts be negotiated on the basis of demonstrated competence and qualifications for the required professional services. The objective of this project is to prepare a 30% design for Nitro Cellulose (NC) Dehydration (including NC Shredding), hereinafter referred as NC Dehy, and Pre-Mix facilities at Radford Army Ammunition Plant (RFAAP) using the most modern, safe, environmentally friendly, and automated technologies to the maximum extent feasible.
Related Procurement Opportunities
Similar tenders in Defence, Chemicals, Industry