Switzerland – Construction work – UW Wittenwil – Baumeister GU
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The Wittenwil substation (UW) was put into operation in the early 1990s. The secondary technology and the auxiliary systems have reached the end of their technical lifespan and must be replaced. The outdoor switchgear is in good condition and does not require any adjustment. There is a high degree of integration with the systems of the previous operator Axpo. In order to maintain the safe operation of the system, various systems must be renewed. Swissgrid is therefore replacing the secondary technology and the auxiliary systems and is building its own substation building (UWG) to provide one
Related Procurement Opportunities
Similar tenders in Building, Infrastructure and construction, Energy, Power and Electrical