Get Free Access
TZ Ref No.: TZ-1002052
Contract Award Awarded Contract 🌍 International (ICB) Romania Construction materials Industry Engineering

Design and execution BH CL 1 - Rehabilitation of Plant 5 Oradea, Default lot

Doc ref no. 00598938-2026
Sector Construction materials, Industry, Engineering
Contract Date 01 Sep 2026
Contract Value Undisclosed
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Contract Description

Design and execution BH CL 1 - Rehabilitation of Plant 5 Oradea, Default lot
The purpose of the contract is the purchase of design and execution services for the Oradea Zonal Water Supply System (BH-CL-1), rehabilitation of Plant 5, according to the specifications in the Specifications. The duration of design and execution - is 15 months from the date of issuing the work start orders + Defect notification period/warranty period: at least 36 months or 48/60 months. The duration of the implementation of the contract is 15 months, of which: - the period of preparation of field studies and project for the technological process: DI ... DI+2 months; - the period for drawing up projects at the level of execution details for all component objects: DI+3 months ...DI+6 months; - period of execution of works: DI+5 months ...DI+15 months, in accordance with point 3.12.2 Time schedule for documents to be submitted by the Contractor from Chapter 2 CS - Requirements of the Contracting Entity - file BH-CL1-Chap 2-Sec 1.1-CG-CSP_rev01. The works include: a) Construction works. b) Supply and installation of machinery and technological equipment. c) Testing and commissioning. d) Fixing any defects that appeared during the minimum 36-month or 48/60-month warranty period. e) Training of the Beneficiarys and/or Operators staff. Note: The award documentation was completed in chapter 5 with a folder called 4 Response to requests for clarifications which includes the consolidated response to the requests for clarifications with their corresponding annexes, formulated by the companies interested in the previous procedure canceled for non-submission of offers, which the bidders will take into account in preparing the offer. According to the General Estimate regarding the expenses necessary to realize the entire regional project, miscellaneous and unforeseen expenses in the amount of 15,039,943 lei were not included in the estimated value of the contract. During the execution of the works, the functioning of the existing networks will be ensured at normal parameters, as the case may be. VISIT THE SITE: Bidders are recommended to inspect the project location and surroundings to evaluate, on their own responsibility, the expense and risk, the data necessary to prepare the bid. Each interested economic operator will send to the contracting entity (at the attention of the UIP European Funds Department (piu@apaoradea.ro), no later than 19 days before the deadline for submitting offers, a Letter of intent regarding the site visit. This will be sent by e-mail to piu@apaoradea.ro, apaoradea@apaoradea.ro. The letter of intent will include the names and personal data of the participants in the visit. The representatives of the economic operators authorized to participate in the visit will have a written power of attorney signed by the economic operator and the identity card or passport, as the case may be. The participants will bear all the necessary expenses for the visit, including the means of transport site is not uploaded to SEAP), the consolidated response will be posted as follows: -EC will only respond to requests for clarifications until the 19th day before the deadline for submitting offers; -EC will send the consolidated response to requests for clarifications on the 15th day before the deadline for submitting offers after the expiration of the term provided above.

Days to Deadline
42 days
Closing: 30 Nov 2026, 00:00

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 00598938-2026
Notice Type Contract Award
Contract CPV 14100000, 10000000, 74200000
Contract Project Location Romania
Contract Value Undisclosed
Contract Date 01 Sep 2026
Contract Deadline 30 Nov 2026

Buyer Contact Information

Contact Details Locked

Nodal officer email, telephone, and website coordinates are unlocked upon free sign up.

Unlock Contact Details (Free) →