Supply and installation of two container units at the Art Academy by the Sea for a period of 8 years Supply and installation of two container units at the Art Academy by the Sea for a period of 8 years
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Supply and installation of two container units at the Art Academy by the Sea for a period of 8 years Supply and installation of two container units at the Art Academy by the Sea for a period of 8 years
Various structural defects were listed. Necessary works are required to prevent the loss of the academys teaching qualifications after the next round of inspections. Some areas will be permanently closed. To accommodate this, it is necessary to place classroom containers on the academy site. By placing these containers, combined with work in the building, we have a short-term solution and the academy is ready for the next inspection round. The term of 8 years with the option to extend by 1 year is necessary, in addition to the short-term plan, to work on a long-term solution for the accommodation of the entire Ostend Part-time Art Education, as both locations present challenges in terms of accessibility and available surface area. The current buildings are not suitable for developing the ambitions that include accessible, inclusive and differentiated art education. In order to explore all possibilities and develop a vision for the future, it is necessary to install the containers for 8 years with a possible 1-year extension on the current site in the Dr. Verhaeghestraat.
Related Procurement Opportunities
Similar tenders in Construction materials, Infrastructure and construction