Establishment of Greenhouse with Hydroponics Facility
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
I GENERAL REQUIREMENTS A. 1.00 lot Project Signboard, COA, Billboard and Project Marker B. 1.00 lot Mobilization and Demobilization II EARTHWORKS A. 224.00 sq.m Site Clearing and Grubbing B. 10.81 cu.m Structure Common Excavation, Common Soil III REINFORCED CONCRETE WORKS 6.72 cu.m Structure Concrete with RSB and Formworks IV MASONRY WORKS A. 36.00 sq.m CHB Non-load Bearing, 4" (including Reinforcing Steel) B. 24.00 sq.m Cement Plaster finish V STEEL FRAMING WORKS 2,690.25 kgs Structural Steel VI PAINTING WORKS 2,690.25 kgs Steel Painting VII ROOFING AND COVERING WORKS 1.00 lot PE, Plastic, Insect Net, Mesh, Shade Net,Weed eliminator, and other accessories VIII HYDROPONIC SYSTEM 1.00 lot PVCX Tubes, PVC Pipes, PE Pipes, Fittings, Controller, Submersible Pump, Multi-fans, Cooling Pads, Aluminum Frames, Hydroponic Pots TERMS AND CONDITIONS 1 Contract period shall be ninety (90) calendar days. 2 Winning bidder should start the work 5 days after the receipt of Notice to Proceed (NTP). 3 The winning bidder should inform the Provincial Agriculturist in writing before the start of work. 4 Liquidated damages shall be charged to contractor for the delay as provided in RA 9184 as well as other contract implementation guidelines concerning this project. 5 Winning bidder shall observe safety precautions during the work and shall be liable for damages to person/property (ies) arising from the construction of the project. 6 Works shall be in conformity to the approved plans and specifications as stipulated on the Program of Works. 7 All materials shall be delivered on jobsite and inspected by the Engineer-in-Charge prior to the construction of work. 8 Winning bidder must clear the construction site upon completion and prior to acceptance by the end user. 9 Winning bidder shall provide 8' x 8' size of tarpaulin with layout as per specifications (refer to Provincial Agriculture Office) Delivery / Contract Period: 90 Day/s Pre-Bid Conference: 03/11/2026 9:30 AM at Conference Room, Leon, Iloilo