Poland – Construction work – Collection, transport and processing of mining waste and management of waste originating from the energetic combustion of hard coal in stoker and pulverized boilers without flue gas desulfurization products (slags) - through their use in construction works of the "Północ" facility in accordance with the approved construction design for the needs of PGG S.A. KWK ROW Ruch Jankowice branch and ZEC branch
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
1. The subject of the order is the collection, transport and processing of mining waste and management of waste originating from the energetic combustion of hard coal in stoker and pulverized boilers without flue gas desulfurization products (slags) - through their use in construction works of the "Północ" facility in accordance with the approved construction design for the needs of PGG S.A. KWK ROW Ruch Jankowice branch and ZEC branch. 2. The order concerns the collection, transport and processing of mining and other waste with the following codes: 1) ex 01 01 02 - waste from the extraction of minerals other than